×
ENGEL top banner

Equipment Effectiveness (Part 1: Injection Moulding)

Equipment EffectivenessThrough the work of the BPF's Productivity Committee, the BPF have produced a series of doucments under the title "Redifining Productivity"

The documents are exclusively available for BPF Members, however as part of the launch of the new activity the BPF are making "Equipment Effectiveness (Part 1: Injection Moulding)" available to all free of charge (until 31st December 2024).

The document...

  • Examines the value that can be gained by changing productivity habits and optimising production processes on equipment
  • Features guidance on how to select and maintain your injection moulding machines to increase production capacity and output and reduce plastic waste
  • Explores the value that can be gained by changing your productivity habits and optimising production processes on equipment.

This guidance document was submitted by equipment specialists Engel UK and Sumitomo (SHI) Demag UK, and from Jaguar Land Rover.

CONTENTS
  • First Steps
  • State of the Art - Technology
    • Reviewing machine options
    • Powering progression in modern manufacturing
    • Technology features to look for
  • Special machinery options
    • Vertical Moulding machines
    • Multi Component machines
    • 3D Printing
  • Saving energy
    • New equipment
      • Optimising existing equipment
      • Heat transference
      • Compressed air leaks
      • Variable Speed Drives (VSD)
  • Increasing output
  • Productive Maintenance
  • Automation
  • Digitalisation
  • Sustainability Impact
  • Education & Skills Impact
  • Risk
  • Rewards
  • Case Studies
    • Case Study 1 – Machine Optimisation
    • Case Study 2 – Energy
  • Funding


Complete the form to download...

 

 
LG Energy banner 2024
Subscribe to BPF updates
Facebook
Twitter
LinkedIn
YouTube

© All rights reserved. Terms and Conditions